Monday, 9 July 2018

BUILDING CONSTRUCTION II - SEMESTER 3


For this group assignment, we were required to plan and design our dream scale-model. My group members were Amy and Tan Xi Chen. We were given four weeks to design the space and come out with the plan of the space and bill of quantity (BQ). We need to collect all the information from shops or online to obtain the prices and specifications of the items that we want to put into our space.
This project is to be done in group (maximum 4 people). Plan and design the layout of a single floor residential home. Our client is an actor, Dwayne Johnson. Our layout must include 3 different space functions and one different space function for 1 person of the group.
Image result for the rock


DESIGN CONCEPT
At first, we found out Dwayne Johnson hobbies which are working out, eating, fishing and so on. So, we decided to create 3 spaces which are gym room for him to work out, kitchen for him to cook and eat, and living room for him to have meeting and discuss important stuff with his clients or agents. I was to design gym room, Amy was to design kitchen and Chen was to design living room.




DESIGN INSPRIRATION
We decided to make an industrial style space for him because he likes things to be exposed so industrial style most suitable for him because industrial style space include exposed bricks, water pipes and so on. The site that we choose for the house is at lakeside because he likes fishing.















FUNCTION AND USES
As I involved in designing gym room for him, so I have studied his workout routine. He repeatedly using few workout equipment so his personal gym room will not be as big as the public gym room.
He also mentioned that he likes sunlight. So in the gym room, I changed some walls into glass panels so that he can enjoy the sunlight while working out and enjoy the view of the lake.



FINISHES
The gym room that I designed is a rectangular shape space, some walls I used glass panels and some walls I used exposed bricks to create an aesthetic effect yet bring out industrial style. The flooring used floating hardwood floor because it easily install and most importantly is it will not break like tiles as gym equipment will frequently hit the floor like dumbbell. On top of floating hardwood floor, I also used gym floor mat to reduce the impact to the floor.
After we designed the space, we went to some shops, such as, HomePro, Ikea, Index Living Mall to find out the items or furniture or furnishes that we want to design the house for Dwayne Johnson, we got the price for all the items that we want.


RC Structure
For this group assignment, we were required to plan and design our dream scale-model. My group members were Amy and Tan Xi Chen. We were given four weeks to design the space and come out with the plan of the space and bill of quantity (BQ). We need to collect all the information from shops or online to obtain the prices and specifications of the items that we want to put into our space.
This project is to be done in group (maximum 4 people). Plan and design the layout of a single floor residential home. Our client is an actor, Dwayne Johnson. Our layout must include 3 different space functions and one different space function for 1 person of the group.



PROCESS
First and foremost, we made base formwork. We used MDF board and wrapped it up with plastic wrapping paper to avoid the MDF from absorbing the water from concrete mixture. After that, we did formwork with modelling board and wrap it up with duct tape for the same purpose which is avoiding the modelling board from absorbing water from concrete so that the formwork will not be destroyed. We also cut the wire gauze according to the formwork size and place it into the formwork to increase the strength of the concrete so that the concrete slab will not break easily. We added the wire gauze for column also.



After we done the base formwork, we mix cement and water to form concrete. When the suitable density the mixture has reached, we poured the mixture into the formwork. We shake the MDF board to allow the mixture occupy evenly.


After 3 days, the concrete has dried and became solid.  We did column formwork with modelling board. The column formworks are as well wrapped it with duct tape to avoid the column from absorbing water. After that we mixed and pouring the mixture into the column formworks. 


After 1 week, we did beam formworks with modelling board and tied the beam wire gauze with the column wire gauze. To create the support for the beam formworks, we added some  small L shape angle. Under the beam, we did some stands to create support in case the beam formworks fall due to overload.



After the beam concrete is completely dried, we did similar stands but different height to support the following slab formworks. We did the formworks with modelling board and wrapped it with duct tape as well.



After 1 week from casting base slab, columns, beams, and roof slab, we started doing internal structures and furniture. For me, I’m doing gym room, so I did flooring, windows and gym equipment.




And it’s all done!


IMPROVEMENT
Some columns are not 90 degree because the materials of formworks we used is not suitable, we should have use wood instead of modelling board and also duct tape cannot be used because the concrete is very dusty and we did not clean it so some columns that supported by duct tape were not 90 degree.