Friday, 3 May 2019

WORKING DRAWING - SEMESTER 5

Assignment 1

We were to choose an opening at site (Mini Library, Serendah) and produce as built-in drawings as per observation. After that, we were to refurbish the selected opening, and to propose a minimum of 2 combination of materials.
This is the site and the window that I chose

Submission 1a


Correction





Submission 1b


Correction



Reflection:
This module is very challenging for me, as I am very weak in detail drawing. I believe my detail drawing will be improved leaps and pounds after taking this module. By producing these drawings, I learned that observation and studying about the construction of the item is the keys to produce detail drawing. As you understand about the structure, you can easily produce the detail drawing. Also, understand about the material also can help to produce good drawing. After knowing all these, detail drawing is not that difficult anymore.




Assignment 2

This assignment was to produce an interior detailing based on the theme given. The objective is to observe an interior fit out based to the variety of materials used, capture and quality of the design, the level of details and perhaps the construction and fixtures. We are required to translate the observation through a set of drawing complete with measurements in an appropriate scale and specification.



Living Room 



Kitchen


Reflection:
After assignment 2, I am more confident in detail drawing. I am also more getting used to the Autocad. The key of producing detail drawing is to truly understand the subject. After you understand the subject, you draw it out based on your observation and adjust the lineweight and putting the description and dimension, then a detail drawing is produced. Now I am ready for Assignment 3 which is producing several construction drawing of my designed architecture.




Assignment 3

Final project required us to produce a series of drawings of the building services of components by working together in the design process and identify solutions to design needs with interior design proposal of an appropriate building scale.


Reflection:
Throughout these drawings, I'm more understand about the building services and industry requirements of M&E. I also understand that these drawings are important for industrial project as it needed to include into contract for client to approve and for contractor to execute it. Understanding of the space is the key to produce these drawings.